The LMVP in 2009

2009 Sampling Summary:

  • 750 Samples Collected
  • 57 Lakes
  • 118 Sites
  • 1300 Hours Worked
  • 8200 Miles Driven
  • 17 “Split Sample” Events

 

(Right: Sites sampled in 2009)

Map of sites sampled by the LMVP in 2009

Split samples in 2009

University of Missouri staff collected 17 simultaneous samples with volunteers in 2009. This “Split Sampling” is a quality control check used to compare the results of MU collected data with those collected by volunteers. To date, there has been no significant difference detected.

Thanks to these volunteers for Split Sampling in 2009:

Herman Bauer, Geri Blakey, Georganne Bowman, Chad Ferguson, Bob Goulding, Mark and David Kuechenmeister, Armand Matthews, Vicky McAlister, David Murray, Carol Pollard, Marc Ramsey, Marion Traynor, Howard Webb, Dan Wollaeger

Map of split sample sites monitored in 2009

The scatter plots to the right show results of Split Samples (1998-2009).

Volunteer-collected samples are shown on the vertical axis, MU staff-collected samples are shown on the horizontal axis. The dotted line represents a perfect 1:1 relationship (R2 = 1.00).

Total phosphorus split sample graph
Chlorophyll split sample graph

 

Back to the Water Line

Brought to you by the Lakes of Missouri Volunteer Program